Shoreline Management Plans (SMPs)

Short (0-20 years), medium (20-50 years) and long term (50-100 years) planning for flood and coastal risk management.

Shoreline Management Plans (SMPs) are high level, non-statutory policy document for coastal defence management planning, and are internationally considered a model of strategic planning at the coast.

Together they set out the strategic 100-year direction of travel for coastal management for Policy Units covering the entire coast, taking climate change into consideration, and based upon agreed objectives subject to high level economic and environmental assessments. The particulars of delivery of the agreed management approaches (Hold the Line, No Active Intervention, Managed Re-alignment or Advance the Line) are left to more focused Coastal Strategies and scheme design.

Coastal groups such as the Southern Coastal Group and SCOPAC provide a forum for discussion and co-operation and play an important role in the development of Shoreline Management Plans for their area.

There are five Shoreline Management Plans within our area of interest:

SCG and SCOPAC Regional SMPs

South Devon & Dorset SMP2

Poole & Christchurch Bays SMP2

North Solent SMP2

Isle of Wight SMP2

South Downs SMP2

Background

In 1994 the Coastal Groups and local authorities of England & Wales were encouraged by Government to adopt the concept of Shoreline Management Plans, with a view to providing a more strategic and sustainable approach to coastal defence. The first SMPs (SMP1) were completed by 2000.

Twenty second-generation SMPs (SMP2) were developed between 2006 and 2012 in England/cross border with Wales. They were developed inclusively and thoroughly by Coastal Groups, government bodies and other stakeholders, are approved by local councils, and finally signed off by the Environment Agency under its Strategic Overview for coastal flood and erosion risk management.

  • an ‘SMP ‘Refresh’ [more below] commenced in 2019

SMP Policy Units:

SMPs divide the 6,000 mile shoreline of England & Wales into a series of cells and sub cells defined by coastal type and processes such as the movement of beach and seabed sediment (sand, shingle, etc) within and between them.

Following broad-brush assessments of the coastal flooding and erosion risks, and taking account of existing defences, people and the developed, historic and natural environments, and adjacent coastal areas, SMPs identify one of four shoreline management policies for sections of coastline (or Policy Units) within a sub-cell.

SMP management policy options:

  • Hold the Line – maintaining the existing line of defence as it is or changing the standard of protection;
  • No Active Intervention (do nothing) means that no investment will be made in coastal defences or other operations other than for safety purposes;
  • Managed Realignment – allowing the shoreline to retreat or advance in a controlled or managed way, either because that is the best approach for a particular stretch of coast, or because the benefits of protection are clearly out of scale with the financial costs;
  • Advance the Line – involves the building of new defences on the seaward side of existing defences.

The chosen policy must be technically feasible, environmentally acceptable and economically sustainable.

A shoreline management policy is applied per Policy Unit for the short (0-20 years), medium (20-50 years) and long term (50-100 years). Current coastal management objectives are often widely accepted and embedded in local planning policy; any future changes in management and policy need time to be implemented and are often, therefore, set in the later epochs (20-50 and 50-100 years).

Within these short, medium and long term timeframes the SMPs will also include an action plan that prioritises what work is needed to manage coastal processes into the future. This in turn will form the basis for deciding and, subject to available funding, putting in place specific flood and erosion risk management schemes, coastal erosion monitoring and further research on how to best adapt to change.

Consequently the SMPs provide a ‘route map’ assisting local authorities to formulate planning strategies and control future development of the shoreline. In addition, the final plans aid government to determine future national funding requirements for flood and coastal erosion risk management.

SMP Refresh 2019/20

According to a recent SMP review (Environment Agency, 2017) nearly a third of management policies contained within them require attention, of which about half may be undeliverable as they stand. SMPs require maintenance to be useful, but maintenance activity and effort across the SMPs has been variable.

An ‘SMP Refresh’ commenced in 2019, using a series of review and development activities to make sure the Plans are up to date, reliable and visible, and ensure onward maintenance is easier. The SMP Refresh will ensure SMPs are and remain ‘living’ documents.”

Within the same 2019/20 time frame, Coastal Partners (formerly the Eastern Solent Coastal Partnership) coordinated an update of the SCG and SCOPAC regional SMP Action Plans:

Southern Coastal Group SMP Action Plan Updates

PDF (2Mb) / Coastal Partners Briefing Note, July 2020
Update of the SMP Action Plans in the SCOPAC and Southern Coastal Group (SCG) Region.

SCG region SMPs

J

South Downs SMP2

Beachy Head to Selsey Bill
Lead: Arun District Council

North Solent SMP2

Selsey Bill to Hurst Spit
Lead: New Forest District Council

Poole & Christchurch Bays SMP2

Hurst Spit to Durlston Head
Lead: BCP Council

South Devon & Dorset SMP2

Durlston Head to Rame Head
Lead: Teinbridge District Council

Isle of Wight SMP2

Isle of Wight
Lead: Isle of Wight Council